Project Completion Certificate (Ground Water)
Scheme ID: 20012274 Name of Scheme: Jasu No. of Villages: 2 No. of Habitation Covered: 7
Total Population Covered: 2710 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 26-Jul-2023 Actual Date of Completion (Capex): 05-Sep-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewells 24.28 Mtr/ 127.01 Mtr Jasu 27.236475 80.337474
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 0.7 M³ per Min /43Mtr Jasu 27.236475 80.337474
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 175 KL/ 12 Mtr Jasu 27.236502 80.337337
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. Pipe 150 0.02083
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6, Class PE-100 63 3.341
2 HDPE Pipe PN-6, Class PE-100 75 4.673
3 HDPE Pipe PN-6, Class PE-100 90 2.183
4 HDPE Pipe PN-6, Class PE-100 110 1.800
5 HDPE Pipe PN-6, Class PE-100 125 0.248
6 HDPE Pipe PN-6, Class PE-100 140 0.028
7 HDPE Pipe PN-6, Class PE-100 160 0.042
HSC Connection
Sno. Total Nos.
1 349
Other Details
2.32
0.00
2.16
04-Dec-2023
24-Dec-2024