Project Completion Certificate (Ground Water)
Scheme ID: 20012286 Name of Scheme: BAMHNAU AALM SHAH No. of Villages: 2 No. of Habitation Covered: 5
Total Population Covered: 3050 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 14-Jun-2023 Actual Date of Completion (Capex): 27-Mar-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewells 26 Mtr/ 90.3 Mtr BAMHNAU AALM SHAH 27.09868 80.66061
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 0.7 M³ per Min /45Mtr BAMHNAU AALM SHAH 27.09868 80.66061
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 200 KL/ 14 Mtr BAMHNAU AALM SHAH 27.097896 80.660427
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. Pipe 150 0.01738
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6, Class PE-100 63 4.178
2 HDPE Pipe PN-6, Class PE-100 75 2.601
3 HDPE Pipe PN-6, Class PE-100 90 3.123
4 HDPE Pipe PN-6, Class PE-100 110 0.774
5 HDPE Pipe PN-6, Class PE-100 125 0.256
6 HDPE Pipe PN-6, Class PE-100 160 0.304
HSC Connection
Sno. Total Nos.
1 416
Other Details
2.40
0.00
2.24
26-Jun-2023
24-Dec-2024