Project Completion Certificate (Ground Water)
Scheme ID: 20012297 Name of Scheme: Kot (GOGP) No. of Villages: 2 No. of Habitation Covered: 5
Total Population Covered: 3970 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 26-Jul-2023 Actual Date of Completion (Capex): 20-Aug-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 30.09 M/ 118.76 M Kot (GOGP) 27.330477 80.255306
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 0.9 M³ per Min /45Mtr Kot (GOGP) 27.330477 80.255306
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 250 KL/ 18 Mtr Kot (GOGP) 27.327478 80.255057
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D. I. Pipe 150 0.01892
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6, Class PE-100 63 4.211
2 HDPE Pipe PN-6, Class PE-100 75 3.991
3 HDPE Pipe PN-6, Class PE-100 90 3.356
4 HDPE Pipe PN-6, Class PE-100 110 0.449
5 HDPE Pipe PN-6, Class PE-100 125 0.093
6 HDPE Pipe PN-6, Class PE-100 140 1.220
7 HDPE Pipe PN-6, Class PE-100 160 5.291
8 HDPE Pipe PN-6, Class PE-100 200 0.831
HSC Connection
Sno. Total Nos.
1 721
Other Details
3.59
0.00
3.51
19-Nov-2023
24-Dec-2024