Project Completion Certificate (Ground Water)
Scheme ID: 20012304 Name of Scheme: Kutubpur (GOGP) No. of Villages: 2 No. of Habitation Covered: 7
Total Population Covered: 5620 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 26-Jul-2023 Actual Date of Completion (Capex): 22-Mar-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewells 27 Mtr/ 105.8 Mtr Kutubpur (GOGP) 27.064874 80.36045
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 1.2 M³ per Min /45 Mtr Kutubpur (GOGP) 27.064874 80.36045
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 350 KL/ 18 Mtr Kutubpur (GOGP) 27.064984 80.360269
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. Pipe 200 0.02386
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6, Class PE-100 63 7.093
2 HDPE Pipe PN-6, Class PE-100 75 3.605
3 HDPE Pipe PN-6, Class PE-100 90 2.010
4 HDPE Pipe PN-6, Class PE-100 110 2.291
5 HDPE Pipe PN-6, Class PE-100 125 1.896
6 HDPE Pipe PN-6, Class PE-100 180 2.248
7 HDPE Pipe PN-6, Class PE-100 200 2.806
HSC Connection
Sno. Total Nos.
1 563
Other Details
4.37
0.00
3.93
21-Jun-2023
24-Dec-2024