Project Completion Certificate (Ground Water)
Scheme ID: 20012337 Name of Scheme: Shuklapur Bhagat No. of Villages: 1 No. of Habitation Covered: 14
Total Population Covered: 8700 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 26-Jul-2023 Actual Date of Completion (Capex): 08-Dec-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 24.05 M/ 117.76 M Shuklapur Bhagat 27.163123 80.162108
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 0.800 M³ per Min /47Mtr Shuklapur Bhagat 27.163123 80.162108
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 250 KL / 18 Mtr Shuklapur Bhagat 27.163142 80.162239
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D. I. Pipe 150 0.021
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6, Class PE-100 63 7.5838
2 HDPE Pipe PN-6, Class PE-100 75 6.0666
3 HDPE Pipe PN-6, Class PE-100 90 5.267
4 HDPE Pipe PN-6, Class PE-100 110 0.6875
5 HDPE Pipe PN-6, Class PE-100 125 2.1167
6 HDPE Pipe PN-6, Class PE-100 140 2.8924
7 HDPE Pipe PN-6, Class PE-100 160 0.6455
8 HDPE Pipe PN-6, Class PE-100 200 0.8709
HSC Connection
Sno. Total Nos.
1 995
Other Details
4.17
0.00
3.94
07-Mar-2024
24-Dec-2024