Project Completion Certificate (Ground Water)
Scheme ID: 20012341 Name of Scheme: Aintha Khera No. of Villages: 3 No. of Habitation Covered: 4
Total Population Covered: 2360 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 26-Jul-2023 Actual Date of Completion (Capex): 30-Sep-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewells 18 Mtr/ 99.8 Mtr Aintha Khera 27.664277 80.139248
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 0.3 M³ per Min /45 Mtr Aintha Khera 27.664277 80.139248
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 75 KL/ 18 Mtr Aintha Khera 27.664129 80.139241
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. Pipe 100 0.01686
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6, Class PE-100 63 2.415
2 HDPE Pipe PN-6, Class PE-100 75 1.838
3 HDPE Pipe PN-6, Class PE-100 90 2.084
4 HDPE Pipe PN-6, Class PE-100 140 4.069
5 HDPE Pipe PN-6, Class PE-100 160 0.784
HSC Connection
Sno. Total Nos.
1 294
Other Details
2.02
0.00
2.01
29-Dec-2023
24-Dec-2024