Project Completion Certificate (Ground Water)
Scheme ID: 20012358 Name of Scheme: Khanigawan Kalan No. of Villages: 2 No. of Habitation Covered: 3
Total Population Covered: 1900 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 26-Jul-2023 Actual Date of Completion (Capex): 20-Mar-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewells 18.0 Mtr/ 128.8 Mtr Khanigawan Kalan 27.492946 79.940757
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 0.2 M³ Per Min /45Mtr Khanigawan Kalan 27.492946 79.940757
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 75KL/ 16Mtr Khanigawan Kalan 27.492913 79.940634
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. Pipe 80 0.018
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6 63 3.109
2 HDPE Pipe PN-6 75 2.519
3 HDPE Pipe PN-6 90 2.374
4 HDPE Pipe PN-6 110 0.142
5 HDPE Pipe PN-6 125 1.624
6 HDPE Pipe PN-6 160 1.170
HSC Connection
Sno. Total Nos.
1 202
Other Details
1.97
1.79
1.79
21-Jun-2023
07-Dec-2024