Project Completion Certificate (Ground Water)
Scheme ID: 20012361 Name of Scheme: Nagla Kallu No. of Villages: 3 No. of Habitation Covered: 4
Total Population Covered: 2130 Base Year: 2021 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 28-Jul-2023 Actual Date of Completion (Capex): 30-Oct-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 15M/116.50 NAGLA KALLU 27.61584 79.97967
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE 0.2M3/MIN/43M NAGLAKALLU 27.61584 79.97967
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 75KL NAGLA KALLU 27.61584 79.97967
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIPE/K-9 100 0.014
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE/PN-6-PE-100 63 2.0814
2 HDPE/PN-6-PE-100 75 1.8515
3 HDPE/PN-6-PE-100 90 0.613
4 HDPE/PN-6-PE-100 110 0.266
5 HDPE/PN-6-PE-100 125 0.112
6 HDPE/PN-6-PE-100 140 0.378
7 HDPE/PN-6-PE-100 160 2.636
8 HDPE/PN-6-PE-100 180 1.076
HSC Connection
Sno. Total Nos.
1 317
Other Details
2.23
2.22
2.22
31-Jan-2024
30-Nov-2024