| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20012365 | Name of Scheme: DAHEE | No. of Villages: 1 | No. of Habitation Covered: 4 |
| Total Population Covered: 3470 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 26-Jul-2023 | Actual Date of Completion (Capex): 20-Aug-2023 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewells | 24.03 Mtr/ 106.79 Mtr | DAHEE | 27.349203 | 80.373162 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible | 0.78 M³ Per Min /45Mtr | DAHEE | 27.349203 | 80.373162 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 225KL/ 18Mtr | DAHEE | 27.349203 | 80.373162 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | D.I. Pipe | 150 | 0.02122 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE Pipe PN-6 | 63 | 4.627 | |
| 2 | HDPE Pipe PN-6 | 75 | 1.986 | |
| 3 | HDPE Pipe PN-6 | 90 | 0.927 | |
| 4 | HDPE Pipe PN-6 | 110 | 0.627 | |
| 5 | HDPE Pipe PN-6 | 125 | 1.415 | |
| 6 | HDPE Pipe PN-6 | 140 | 3.194 | |
| 7 | HDPE Pipe PN-6 | 180 | 0.128 | |
| 8 | HDPE Pipe PN-6 | 200 | 3.660 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 445 |