Project Completion Certificate (Ground Water)
Scheme ID: 20012365 Name of Scheme: DAHEE No. of Villages: 1 No. of Habitation Covered: 4
Total Population Covered: 3470 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 26-Jul-2023 Actual Date of Completion (Capex): 20-Aug-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewells 24.03 Mtr/ 106.79 Mtr DAHEE 27.349203 80.373162
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 0.78 M³ Per Min /45Mtr DAHEE 27.349203 80.373162
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 225KL/ 18Mtr DAHEE 27.349203 80.373162
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. Pipe 150 0.02122
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6 63 4.627
2 HDPE Pipe PN-6 75 1.986
3 HDPE Pipe PN-6 90 0.927
4 HDPE Pipe PN-6 110 0.627
5 HDPE Pipe PN-6 125 1.415
6 HDPE Pipe PN-6 140 3.194
7 HDPE Pipe PN-6 180 0.128
8 HDPE Pipe PN-6 200 3.660
HSC Connection
Sno. Total Nos.
1 445
Other Details
3.69
3.07
3.07
22-Nov-2023
07-Dec-2024