| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20012392 | Name of Scheme: Kurval Banaras | No. of Villages: 1 | No. of Habitation Covered: 1 |
| Total Population Covered: 3500 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 28-May-2023 | Actual Date of Completion (Capex): 20-Feb-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 36.07 M / 91.78 M | Kurval Banaras | 28.438434 | 77.831409 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUMERSIBLE | 700 LPM / 48.60 M | Kurval Banaras | 28.438434 | 77.831409 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 200 KL / 14 M | Kurval Banaras | 28.438597 | 77.831401 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 150 | 0.021 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 6.05 | |
| 2 | HDPE | 75 | 0.200 | |
| 3 | HDPE | 110 | 0.060 | |
| 4 | HDPE | 140 | 0.448 | |
| 5 | HDPE | 160 | 0.204 | |
| 6 | HDPE | 180 | 0.359 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 596 |