Project Completion Certificate (Ground Water)
Scheme ID: 20012395 Name of Scheme: Khawazapur Mirpur No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 4905 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 28-May-2023 Actual Date of Completion (Capex): 25-Feb-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 32.00 M / 80.02 M Khawazapur Mirpur 28.383905 77.876787
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 1020 LPM / 50.6 M Khawazapur Mirpur 28.383905 77.876787
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 300 KL / 16 M Khawazapur Mirpur 28.383905 77.876787
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 150 0.0146
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 9.670
2 HDPE 75 0.599
3 HDPE 90 0.234
4 HDPE 110 0.0591
5 HDPE 140 0.411
6 HDPE 160 1.127
7 HDPE 180 0.409
HSC Connection
Sno. Total Nos.
1 1121
Other Details
2.90
2.87
2.92
25-May-2024
26-May-2024