| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20012401 | Name of Scheme: Utsara | No. of Villages: 1 | No. of Habitation Covered: 1 |
| Total Population Covered: 1839 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 28-May-2023 | Actual Date of Completion (Capex): 10-Jan-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 24 M / 84.06 M | UTSARA | 28.585465 | 77.823415 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUMERSIBLE | 375 LPM / 46.60 M | UTSARA | 28.585465 | 77.823415 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT -1 | 100 KL / 12 M | UTSARA | 28.585431 | 77.823427 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 2.525 | |
| 2 | HDPE | 75 | 0.237 | |
| 3 | HDPE | 90 | 0.119 | |
| 4 | HDPE | 110 | 0.132 | |
| 5 | HDPE | 140 | 0.355 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 100 | 0.0158 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 139 |