| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20012405 | Name of Scheme: Kalauli | No. of Villages: 1 | No. of Habitation Covered: 1 |
| Total Population Covered: 4890 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 17-Jul-2023 | Actual Date of Completion (Capex): 08-Mar-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 33.06 M / 82.35 M | Kalauli | 28.403687 | 77.916290 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUMERSIBLE | 975 LPM / 46.60 M | Kalauli | 28.403687 | 77.916290 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 275 KL / 12 M | Kalauli | 28.403862 | 77.916170 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 150 | 0.0268 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 6.805 | |
| 2 | HDPE | 75 | 0.506 | |
| 3 | HDPE | 90 | 0.618 | |
| 4 | HDPE | 110 | 0.958 | |
| 5 | HDPE | 140 | 0.918 | |
| 6 | HDPE | 180 | 1.304 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 692 |