Project Completion Certificate (Ground Water)
Scheme ID: 20012405 Name of Scheme: Kalauli No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 4890 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 17-Jul-2023 Actual Date of Completion (Capex): 08-Mar-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 33.06 M / 82.35 M Kalauli 28.403687 77.916290
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUMERSIBLE 975 LPM / 46.60 M Kalauli 28.403687 77.916290
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 275 KL / 12 M Kalauli 28.403862 77.916170
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 150 0.0268
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 6.805
2 HDPE 75 0.506
3 HDPE 90 0.618
4 HDPE 110 0.958
5 HDPE 140 0.918
6 HDPE 180 1.304
HSC Connection
Sno. Total Nos.
1 692
Other Details
2.65
2.65
2.70
20-Jun-2025
21-Jun-2025