Project Completion Certificate (Ground Water)
Scheme ID: 20012408 Name of Scheme: Sharifpur Bhansroli No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 5733 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 17-Jul-2023 Actual Date of Completion (Capex): 24-Mar-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 24.14 / 114.39 SHARIFPUR BHANSROLI 28.579864 77.895668
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUMERSIBLE 1100 / 47 SHARIFPUR BHANSROLI 28.579864 77.895668
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 300 KL / 12 M SHARIFPUR BHANSROLI 28.579904 77.895572
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 200 0.01735
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 14.281
2 HDPE 75 0.779
3 HDPE 90 0.912
4 HDPE 110 0.973
5 HDPE 125 0.099
6 HDPE 140 1.462
7 HDPE 160 0.227
8 HDPE 180 0.329
9 HDPE 200 0.294
HSC Connection
Sno. Total Nos.
1 961
Other Details
3.43
3.42
3.35
24-Mar-2025
25-Mar-2025