Project Completion Certificate (Ground Water)
Scheme ID: 20012411 Name of Scheme: Jagatpur Alias Sultanpur No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 2100 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 17-Jul-2023 Actual Date of Completion (Capex): 15-Jan-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 21 M / 87.65 M JAGATPUR ALIAS SULTANPUR 28.32441 77.50174
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUMERSIBLE 450 LPM / 46.60 M JAGATPUR ALIAS SULTANPUR 28.32441 77.50174
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT- 1 125 KL / 12 M JAGATPUR ALIAS SULTANPUR 28.325263 77.750059
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.0278
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 5.675
2 HDPE 75 0.274
3 HDPE 90 0.654
4 HDPE 110 0.370
5 HDPE 140 0.542
HSC Connection
Sno. Total Nos.
1 362
Other Details
1.66
1.65
1.69
15-May-2025
16-May-2025