| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20012430 | Name of Scheme: Amethiya Msinha | No. of Villages: 2 | No. of Habitation Covered: 5 |
| Total Population Covered: 2680 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 26-Jul-2023 | Actual Date of Completion (Capex): 28-Jun-2023 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewells | 22.08Mtr/ 63.84Mtr | Amethiya Msinha | 27.443913 | 80.361404 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible | 0.62 M³ per Min /45Mtr | Amethiya Msinha | 27.443913 | 80.361404 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 200KL/ 16Mtr | Amethiya Msinha | 27.443934 | 80.361429 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | D.I. Pipe | 150 | 0.02134 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE Pipe PN-6: Class PE-100 | 63 | 2.863 | |
| 2 | HDPE Pipe PN-6: Class PE-100 | 75 | 2.395 | |
| 3 | HDPE Pipe PN-6: Class PE-100 | 90 | 3.177 | |
| 4 | HDPE Pipe PN-6: Class PE-100 | 110 | 1.459 | |
| 5 | HDPE Pipe PN-6: Class PE-100 | 125 | 0.234 | |
| 6 | HDPE Pipe PN-6: Class PE-100 | 140 | 0.272 | |
| 7 | HDPE Pipe PN-6: Class PE-100 | 160 | 1.186 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 406 |