Project Completion Certificate (Ground Water)
Scheme ID: 20012481 Name of Scheme: Newada Chathiya No. of Villages: 3 No. of Habitation Covered: 5
Total Population Covered: 2660 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 26-Jul-2023 Actual Date of Completion (Capex): 24-Feb-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewells 18.01 Mtr/ 124.32 Mtr Newada Chathiya 27.630028 80.112753
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 0.3 M³ Per Min /43Mtr Newada Chathiya 27.630028 80.112753
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 100 KL/ 16 Mtr Newada Chathiya 27.62992 80.112738
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. Pipe 100 0.01362
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6 63 3.394
2 HDPE Pipe PN-6 75 3.402
3 HDPE Pipe PN-6 90 3.092
4 HDPE Pipe PN-6 110 0.955
5 HDPE Pipe PN-6 140 0.202
6 HDPE Pipe PN-6 160 1.691
7 HDPE Pipe PN-6 180 1.602
HSC Connection
Sno. Total Nos.
1 258
Other Details
2.22
0.00
2.17
23-May-2023
24-Dec-2024