Project Completion Certificate (Ground Water)
Scheme ID: 20012492 Name of Scheme: Chathia Buzurg No. of Villages: 4 No. of Habitation Covered: 4
Total Population Covered: 2650 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 26-Jul-2023 Actual Date of Completion (Capex): 05-Sep-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewells 24Mtr/ 118.15Mtr Chathia Buzurg 27.666479 80.248684
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 0.6 M³ per Min /45Mtr Chathia Buzurg 27.666479 80.248684
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 175KL/ 16Mtr Chathia Buzurg 27.666328 80.248411
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. Pipe 150 0.0191
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6, Class PE-100 63 3.195
2 HDPE Pipe PN-6, Class PE-100 75 2.260
3 HDPE Pipe PN-6, Class PE-100 90 1.549
4 HDPE Pipe PN-6, Class PE-100 110 1.502
5 HDPE Pipe PN-6, Class PE-100 125 0.656
6 HDPE Pipe PN-6, Class PE-100 140 0.119
7 HDPE Pipe PN-6, Class PE-100 160 0.412
HSC Connection
Sno. Total Nos.
1 423
Other Details
2.34
0.00
2.12
04-Dec-2023
24-Dec-2024