Project Completion Certificate (Ground Water)
Scheme ID: 20012507 Name of Scheme: ADAMPUR No. of Villages: 4 No. of Habitation Covered: 9
Total Population Covered: 3750 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 26-Jul-2023 Actual Date of Completion (Capex): 16-Jan-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 22 M/ 115 M ADAMPUR 27.192274 80.533418
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 0.9 M³ per Min /45Mtr ADAMPUR 27.192274 80.533418
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 250 KL/18 Mtr ADAMPUR 27.192707 80.533366
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D. I. Pipe 150 0.01889
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6, Class PE-100 63 5.367
2 HDPE Pipe PN-6, Class PE-100 75 4.312
3 HDPE Pipe PN-6, Class PE-100 90 1.936
4 HDPE Pipe PN-6, Class PE-100 110 0.583
5 HDPE Pipe PN-6, Class PE-100 125 0.817
6 HDPE Pipe PN-6, Class PE-100 160 2.481
7 HDPE Pipe PN-6, Class PE-100 180 0.320
8 HDPE Pipe PN-6, Class PE-100 200 0.481
HSC Connection
Sno. Total Nos.
1 650
Other Details
3.34
0.00
3.18
15-Apr-2023
24-Dec-2024