Project Completion Certificate (Ground Water)
Scheme ID: 20012523 Name of Scheme: Mavaiya No. of Villages: 2 No. of Habitation Covered: 7
Total Population Covered: 6160 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 26-Jul-2023 Actual Date of Completion (Capex): 02-Mar-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 31.02M/ 91.79M Mavaiya 27.507805 80.095302
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 1.400 M³ per Min /45Mtr Mavaiya 27.507805 80.095302
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 400KL/ 16Mtr Mavaiya 27.50785 80.095233
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D. I. Pipe 200 0.02379
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6, Class PE-100 63 6.910
2 HDPE Pipe PN-6, Class PE-100 75 4.798
3 HDPE Pipe PN-6, Class PE-100 90 5.1145
4 HDPE Pipe PN-6, Class PE-100 110 2.9005
5 HDPE Pipe PN-6, Class PE-100 125 0.1915
6 HDPE Pipe PN-6, Class PE-100 140 0.011
7 HDPE Pipe PN-6, Class PE-100 200 1.347
HSC Connection
Sno. Total Nos.
1 528
Other Details
4.14
0.00
3.82
01-Jun-2023
24-Dec-2024