Project Completion Certificate (Ground Water)
Scheme ID: 20012540 Name of Scheme: DIGHIA No. of Villages: 2 No. of Habitation Covered: 7
Total Population Covered: 2290 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 26-Jul-2023 Actual Date of Completion (Capex): 23-Sep-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewells 24Mtr/ 125.84Mtr DIGHIA 27.645276 80.068426
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 0.6 M³ per Min /45Mtr DIGHIA 27.645276 80.068426
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 150KL/ 16Mtr DIGHIA 27.645282 80.06837
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. Pipe 150 0.02164
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6 Class PE-100 63 2.253
2 HDPE Pipe PN-6 Class PE-100 75 2.454
3 HDPE Pipe PN-6 Class PE-100 90 1.525
4 HDPE Pipe PN-6 Class PE-100 110 1.415
5 HDPE Pipe PN-6 Class PE-100 125 1.158
6 HDPE Pipe PN-6 Class PE-100 140 1.500
7 HDPE Pipe PN-6 Class PE-100 160 0.532
HSC Connection
Sno. Total Nos.
1 249
Other Details
2.11
0.00
1.98
22-Dec-2023
25-Dec-2024