Project Completion Certificate (Ground Water)
Scheme ID: 20012541 Name of Scheme: MASFANA JJM No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 1500 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 26-Jul-2023 Actual Date of Completion (Capex): 01-Oct-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewells 15.09Mtr/ 127.81Mtr Masfana 27.559192 80.077939
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 0.2M3/Min /43Mtr Masfana 27.559192 80.077939
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 50KL/ 12Mtr Masfana 27.559192 80.077939
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. Pipe 80 0.0126
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 Pipe PN-6 Class PE-100 63 1.449
2 Pipe PN-6 Class PE-100 75 1.618
3 Pipe PN-6 Class PE-100 90 0.666
4 Pipe PN-6 Class PE-100 140 1.358
HSC Connection
Sno. Total Nos.
1 130
Other Details
1.54
1.33
1.33
02-Jan-2024
30-Nov-2024