Project Completion Certificate (Ground Water)
Scheme ID: 20012558 Name of Scheme: Bahadurpur No. of Villages: 2 No. of Habitation Covered: 3
Total Population Covered: 1690 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 26-Jul-2023 Actual Date of Completion (Capex): 13-Oct-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewells 18.0 Mtr/ 132.84 Mtr Bahadurpur 27.226037 80.497127
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 0.2 M³ Per Min /45Mtr Bahadurpur 27.226037 80.497127
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 50 KL/ 14 Mtr Bahadurpur 27.229231 80.528044
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. Pipe 80 0.02165
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6 63 3.109
2 HDPE Pipe PN-6 75 0.714
3 HDPE Pipe PN-6 90 2.023
4 HDPE Pipe PN-6 110 0.826
5 HDPE Pipe PN-6 160 0.742
HSC Connection
Sno. Total Nos.
1 276
Other Details
1.51
0.00
1.49
12-Jan-2024
24-Dec-2024