Project Completion Certificate (Ground Water)
Scheme ID: 20012567 Name of Scheme: SHAHPUR (GOGP) No. of Villages: 7 No. of Habitation Covered: 8
Total Population Covered: 6130 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 14-Jun-2023 Actual Date of Completion (Capex): 10-Dec-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewells 25 Mtr/ 99.3 Mtr SHAHPUR (GOGP) 27.180522 80.495788
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 1.4 M³ per Min /45 Mtr SHAHPUR (GOGP) 27.180522 80.495788
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 400 KL/ 16 Mtr SHAHPUR (GOGP) 27.18883 80.492515
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. Pipe 200 0.01854
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6, Class PE-100 63 7.703
2 HDPE Pipe PN-6, Class PE-100 75 4.465
3 HDPE Pipe PN-6, Class PE-100 90 3.953
4 HDPE Pipe PN-6, Class PE-100 100 2.284
5 HDPE Pipe PN-6, Class PE-100 140 1.571
6 HDPE Pipe PN-6, Class PE-100 160 1.010
7 HDPE Pipe PN-6, Class PE-100 200 0.999
HSC Connection
Sno. Total Nos.
1 917
Other Details
4.36
0.00
4.05
09-Mar-2024
24-Dec-2024