Project Completion Certificate (Ground Water)
Scheme ID: 20012585 Name of Scheme: BASEN No. of Villages: 1 No. of Habitation Covered: 4
Total Population Covered: 3690 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 05-Mar-2023 Actual Date of Completion (Capex): 04-Aug-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewells 24.06Mtr/ 114.86 Mtr BASEN 27.310607 80.390485
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 0.8 M³ per Min /45Mtr BASEN 27.310607 80.390485
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 250 KL/ 16 Mtr BASEN 27.310469 80.39075
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. Pipe 150 0.02235
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6, Class PE-100 63 3.384
2 HDPE Pipe PN-6, Class PE-100 75 3.525
3 HDPE Pipe PN-6, Class PE-100 90 1.374
4 HDPE Pipe PN-6, Class PE-100 110 3.033
5 HDPE Pipe PN-6, Class PE-100 125 0.761
6 HDPE Pipe PN-6, Class PE-100 160 0.240
7 HDPE Pipe PN-6, Class PE-100 200 0.267
HSC Connection
Sno. Total Nos.
1 594
Other Details
2.91
0.00
2.83
03-Nov-2023
24-Dec-2024