Scheme ID: 20012613 Name of Scheme: Akana No. of Villages: 1 No. of Habitation Covered: 5
Total Population Covered: 3580 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 15-Sep-2021 Actual Date of Completion (Capex): 31-Dec-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 4.373 As per Site
2 HDPE 75 2.708 As per Site
3 HDPE 90 1.928 As per Site
4 HDPE 110 0.910 As per Site
5 HDPE 140 1.392 As per Site
6 HDPE 160 1.98 As per Site
7 HDPE 180 0.818 As per Site
8 HDPE 200 0.424 As per Site
HSC Connection
Sno. Total Nos.
Other Details
3.58
3.29
3.29
31-Mar-2024
01-Apr-2024