Scheme ID: 20012654 Name of Scheme: Alapur No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 2820 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 12-Oct-2022 Actual Date of Completion (Capex): 20-Dec-2022
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewells 36.09/225.28 Alapur 26.274669' 80.130908'
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 39.80(M3/Hr.)/60 Mtr. Alapur 26.274669' 80.130908'
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 175/16 Alapur 26.274669' 80.130908'
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. 150 0.010
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 5890
2 HDPE 75 127
3 HDPE 90 259.00
4 HDPE 110 107
5 HDPE 140 1230
6 HDPE 160 434
HSC Connection
Sno. Total Nos.
Other Details
2.48
2.28
2.28
31-Mar-2023
01-Apr-2023