Project Completion Certificate (Ground Water)
Scheme ID: 20012729 Name of Scheme: GOKULA WATER SUPPLY SCHEME No. of Villages: 3 No. of Habitation Covered: 3
Total Population Covered: 2570 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-Aug-2025 Actual Date of Completion (Capex): 31-Mar-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 24/210.04 Gokula 25.778622 81.995694
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible pump 31/55 Gokula 25.778622 81.995694
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 150/16 Gokula 25.778908 81.991500
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI-K9 100 0.011 DI
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 10.1978 HDPE
2 HDPE 75 0.7703 HDPE
3 HDPE 90 1.2276 HDPE
4 HDPE 110 0.4115 HDPE
5 HDPE 140 0.2033 HDPE
HSC Connection
Sno. Total Nos.
1 390
Other Details
1.92
0.00
1.92
31-Mar-2025
01-Apr-2025