| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20012729 | Name of Scheme: GOKULA WATER SUPPLY SCHEME | No. of Villages: 3 | No. of Habitation Covered: 3 |
| Total Population Covered: 2570 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 31-Aug-2025 | Actual Date of Completion (Capex): 31-Mar-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 24/210.04 | Gokula | 25.778622 | 81.995694 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible pump | 31/55 | Gokula | 25.778622 | 81.995694 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 150/16 | Gokula | 25.778908 | 81.991500 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI-K9 | 100 | 0.011 | DI |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 10.1978 | HDPE |
| 2 | HDPE | 75 | 0.7703 | HDPE |
| 3 | HDPE | 90 | 1.2276 | HDPE |
| 4 | HDPE | 110 | 0.4115 | HDPE |
| 5 | HDPE | 140 | 0.2033 | HDPE |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 390 |