Project Completion Certificate (Ground Water)
Scheme ID: 20012739 Name of Scheme: IMILIYADIH GP WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 1647 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 23-Sep-2024 Actual Date of Completion (Capex): 22-Apr-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Depth of Strainer (m) 18 TW 25.885245 83.571851
2 Depth of Plain Pipe (m) 288.3 TW 25.885245 83.571851
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 400/46 TW 25.885245 83.571851
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Zinc Tank 100 13 25.885245 83.571851
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K7 100 0.03
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PN6 PE100 63 3.26
2 HDPE PN6 PE100 75 0.89
3 HDPE PN6 PE100 110 0.24
4 HDPE PN6 PE100 140 0.256
5 HDPE PN6 PE100 160 0.25
6 HDPE PN6 PE100 200 0.036
HSC Connection
Sno. Total Nos.
1 233
Other Details
1.92
1.92
0.00
22-Apr-2025
23-Apr-2025