Project Completion Certificate (Ground Water)
Scheme ID: 20012907 Name of Scheme: CHHATRI No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 2046 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 04-Mar-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 33.06 M / 94.59 M Chhatri 28°49'52.3"N 77°46'10.0"E
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 450 LPM / 52 M Chhatri 28°49'52.3"N 77°46'10.0"E
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 150 Kl / 14 M Chhatri 28°49'52.3"N 77°46'10.0"E
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. 150 0.014
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 6.282
2 HDPE 90 0.164
3 HDPE 110 0.107
4 HDPE 140 0.634
HSC Connection
Sno. Total Nos.
1 408
Other Details
2.44
2.44
1.91
20-Mar-2024
08-Oct-2024