| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20012907 | Name of Scheme: CHHATRI | No. of Villages: 1 | No. of Habitation Covered: 1 |
| Total Population Covered: 2046 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 31-Dec-2024 | Actual Date of Completion (Capex): 04-Mar-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 33.06 M / 94.59 M | Chhatri | 28°49'52.3"N | 77°46'10.0"E |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible | 450 LPM / 52 M | Chhatri | 28°49'52.3"N | 77°46'10.0"E |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 150 Kl / 14 M | Chhatri | 28°49'52.3"N | 77°46'10.0"E |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | D.I. | 150 | 0.014 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 6.282 | |
| 2 | HDPE | 90 | 0.164 | |
| 3 | HDPE | 110 | 0.107 | |
| 4 | HDPE | 140 | 0.634 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 408 |