Project Completion Certificate (Ground Water)
Scheme ID: 20012964 Name of Scheme: Sardarpur No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 3425 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 05-Feb-2022 Actual Date of Completion (Capex): 04-Feb-2022
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 2741.30
2 HDPE 75 1958
3 HDPE 90 1081
4 HDPE 110 430
5 HDPE 140 863
6 HDPE 160 464.50
7 HDPE 180 135
HSC Connection
Sno. Total Nos.
Other Details
2.14
2.39
2.39
31-Mar-2024
01-Apr-2024