Project Completion Certificate (Ground Water)
Scheme ID: 20012976 Name of Scheme: Rurgaon No. of Villages: 2 No. of Habitation Covered: 5
Total Population Covered: 4400 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 05-Feb-2022 Actual Date of Completion (Capex): 31-Dec-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube well 30.33/187.81 Rurgaon 26.247427 79.759252
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 49.40/71 Rurgaon 26.247427 79.759252
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 300/16 Rurgaon 26.247427 79.759252
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 150 0.020 As per Site
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 7.992 As per Site
2 HDPE 75 1.441 As per Site
3 HDPE 90 0.211 As per Site
4 HDPE 110 0.131 As per Site
5 HDPE 125 0.863 As per Site
6 HDPE 140 0.797 As per Site
7 HDPE 160 0.130 As per Site
8 HDPE 180 0.534 As per Site
HSC Connection
Sno. Total Nos.
1 695
Other Details
2.53
2.83
2.83
30-Jun-2023
01-Jul-2023