Project Completion Certificate (Ground Water)
Scheme ID: 20013193 Name of Scheme: SIKANDAR PUR No. of Villages: 3 No. of Habitation Covered: 6
Total Population Covered: 2160 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 14-Jun-2023 Actual Date of Completion (Capex): 25-Mar-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewells 18.05 Mtr/ 128.26 Mtr SIKANDAR PUR 27.352291 80.090109
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 0.48 M³ per Min /45Mtr SIKANDAR PUR 27.352291 80.090109
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 150 KL/ 14Mtr SIKANDAR PUR 27.352216 80.089966
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. Pipe 150 0.01836
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6 Class PE-100 63 1.959
2 HDPE Pipe PN-6 Class PE-100 75 1.928
3 HDPE Pipe PN-6 Class PE-100 90 0.551
4 HDPE Pipe PN-6 Class PE-100 110 2.207
5 HDPE Pipe PN-6 Class PE-100 140 0.100
6 HDPE Pipe PN-6 Class PE-100 160 0.902
HSC Connection
Sno. Total Nos.
1 287
Other Details
195.30
0.00
190.72
24-Jun-2023
25-Dec-2024