Project Completion Certificate (Ground Water)
Scheme ID: 20013252 Name of Scheme: PARASIA OJHHA GP WATER SUPPLY SCHEME No. of Villages: 3 No. of Habitation Covered: 3
Total Population Covered: 2100 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 10-Sep-2023 Actual Date of Completion (Capex): 23-Mar-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TW 12/85.99 Parasia Ojhha 26.384738 83.777338
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT-PUMP 400/45 Parasia Ojhha 26.384738 83.777338
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 125KL/14M Parasia Ojhha 26.384852 83.777237
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIPE(K9) 100 40
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE 63 3971.1
2 HDPE PIPE 75 290.6
3 HDPE PIPE 90 0
4 HDPE PIPE 110 433.9
5 HDPE PIPE 125 893
6 HDPE PIPE 140 564
7 HDPE PIPE 160 720.1
8 HDPE PIPE 180 0
9 HDPE PIPE 200 132.4
10 HDPE PIPE 250 0
11 HDPE PIPE 300 0
HSC Connection
Sno. Total Nos.
1 290
Other Details
16535000.68
16535000.68
17291137.04
23-Jun-2024
01-Jan-2025