| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20013270 | Name of Scheme: MOHMADPUR SADA BILA AHATMALI WATER SUPPLY SCHEME | No. of Villages: 2 | No. of Habitation Covered: 2 |
| Total Population Covered: 3051 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 10-Feb-2024 | Actual Date of Completion (Capex): 12-Dec-2023 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 49.62 MTR / 101.21 MTR | MOHAMMADPUR SADA BILA AHATMALI | 29.320365 | 78.529389 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSIBLE PUMP 10 HP | 450 LPM / 46 MTR | MOHAMMADPUR SADA BILA AHATMALI | 29.320365 | 78.529389 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | ZINC ALLUMINIUM OVER HEAD TANK | 125 KL/ 16 MTR | MOHAMMADPUR SADA BILA AHATMALI | 29.320365 | 78.529389 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI PIPE K-7 | 100 | 0.020 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PIPE PN-06 CLASS PE-100 | 140 | 0.134 | |
| 2 | HDPE PIPE PN-06 CLASS PE-100 | 125 | 0.106 | |
| 3 | HDPE PIPE PN-06 CLASS PE-100 | 110 | 1.087 | |
| 4 | HDPE PIPE PN-06 CLASS PE-100 | 90 | 0.082 | |
| 5 | HDPE PIPE PN-06 CLASS PE-100 | 75 | 0.133 | |
| 6 | HDPE PIPE PN-06 CLASS PE-100 | 63 | 4.407 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 294 |