Project Completion Certificate (Ground Water)
Scheme ID: 20013582 Name of Scheme: CHAUKO KHURD WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 5
Total Population Covered: 2690 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 24-Feb-2023 Actual Date of Completion (Capex): 10-Jan-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 11.04/84.92 Chauko Khurd 26.1843333 83.3935833
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 400/40 Chauko Khurd 26.1843333 83.3935833
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 75/12 Chauko Khurd 26.1843333 83.3935833
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K-7/DI PIPE 100 0.03
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 63 9.402
2 HDPE Pipe PN-6: Class PE-100 75 0.306
3 HDPE Pipe PN-6: Class PE-100 90 0.331
4 HDPE Pipe PN-6: Class PE-100 110 0.542
5 HDPE Pipe PN-6: Class PE-100 140 0.218
HSC Connection
Sno. Total Nos.
1 302
Other Details
2.50
2.50
2.43
11-Apr-2024
12-Apr-2024