| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20013919 | Name of Scheme: Malmazra | No. of Villages: 1 | No. of Habitation Covered: 1 |
| Total Population Covered: 1707 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 31-Dec-2024 | Actual Date of Completion (Capex): 20-May-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 18/110 | MALMAZRA | 28.082614 | 77.363954 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSIBLE PUMP | 400/76 | MALMAZRA | 28.082614 | 77.363954 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 150/16 | MALMAZRA | 28.082645 | 77.363912 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | K7 | 100 | 0.030 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 90 | 0.026 | |
| 2 | HDPE | 75 | 0.085 | |
| 3 | HDPE | 63 | 2.4906 | |
| 4 | HDPE | 125 | 0.7451 | |
| 5 | HDPE | 110 | 0.2972 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 393 |