| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20013921 | Name of Scheme: Rasulpur Urf Bharatpur | No. of Villages: 1 | No. of Habitation Covered: 4 |
| Total Population Covered: 2061 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 30-Jun-2026 | Actual Date of Completion (Capex): 24-Oct-2026 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 15/113.01 | BHARATPUR | 27.307677 | 79.411145 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSIBLE PUMP | 450/58.69 | BHARATPUR | 27.307677 | 79.411145 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 125/12 | BHARATPUR | 27.307677 | 79.411145 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI -K9 | 80 | 39.6 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 2.58250 | |
| 2 | HDPE | 75 | 0.5012 | |
| 3 | HDPE | 90 | 0.15837 | |
| 4 | HDPE | 110 | 0.165 | |
| 5 | HDPE | 140 | 0.8554 | |
| 6 | HDPE | 160 | 0.98760 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 348 |