| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20013983 | Name of Scheme: RAHTI JAGIR WATER SUPPLY SCHEME | No. of Villages: 1 | No. of Habitation Covered: 1 |
| Total Population Covered: 3029 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 30-Sep-2023 | Actual Date of Completion (Capex): 10-Dec-2023 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 24.04 MTR / 157.17 MTR | RAHTI JAGIR | 29.091786 | 78.443399 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSIBLE PUMP 7.50 HP | 500 LPM / 35 MTR | RAHTI JAGIR | 29.091786 | 78.443399 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | RCC OVER HEAD TANK | 150 KL /10 MTR | RAHTI JAGIR | 29.085684 | 78.44909 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI PIPE K-7 | 100 | 0.034 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PIPE PN-06 PE-100 | 140 | 0.112 | |
| 2 | HDPE PIPE PN-06 PE-100 | 125 | 0.169 | |
| 3 | HDPE PIPE PN-06 PE-100 | 90 | 0.280 | |
| 4 | HDPE PIPE PN-06 PE-100 | 75 | 0.569 | |
| 5 | HDPE PIPE PN-06 PE-100 | 63 | 4.319 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 373 |