Scheme ID: 20013992 Name of Scheme: DARBARA WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 2927 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 10-Feb-2024 Actual Date of Completion (Capex): 27-Feb-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL WORK 49.75 MTR / 101.25 MTR DARBARA 29.101046 78.274179
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 10 HP 475 LPM / 42 MTR DARBARA 29.101046 78.274179
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 175 KL / 14 MTR DARBARA 29.101080 78.274128
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K-7 DI PIPE 100 0.014
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN- 6 CLASS PE-100 125 0.129
2 HDPE PIPE PN- 6 CLASS PE-100 140 0.016
3 HDPE PIPE PN- 6 CLASS PE-100 110 1.194
4 HDPE PIPE PN- 6 CLASS PE-100 90 0.812
5 HDPE PIPE PN- 6 CLASS PE-100 75 0.503
6 HDPE PIPE PN- 6 CLASS PE-100 63 8.560
HSC Connection
Sno. Total Nos.
1 623
Other Details
2.74
2.52
2.52
26-Aug-2024
27-Aug-2024