Project Completion Certificate (Ground Water)
Scheme ID: 20014032 Name of Scheme: KHURAHERY WATER SUPPLY SCHEME No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 3417 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 02-Nov-2023 Actual Date of Completion (Capex): 03-Jul-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 49.83 MTR / 101.25 MTR KHURAHERY 29.560476 78.140655
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 20 HP 700 LPM / 53 MTR KHURAHERY 29.560476 78.140655
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 200 KL / 16 MTR KHURAHERY 29.560326 78.140564
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K-7 DI PIPE 150 0.019
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN-6 CLASS PE-100 140 0.153
2 HDPE PIPE PN-6 CLASS PE-100 125 0.146
3 HDPE PIPE PN-6 CLASS PE-100 110 0.553
4 HDPE PIPE PN-6 CLASS PE-100 920 0.153
5 HDPE PIPE PN-6 CLASS PE-100 75 0.179
6 HDPE PIPE PN-6 CLASS PE-100 63 7.073
HSC Connection
Sno. Total Nos.
1 498
Other Details
2.34
2.34
2.34
31-Dec-2024
01-Jan-2025