Project Completion Certificate (Ground Water)
Scheme ID: 20014035 Name of Scheme: GOPALPUR WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 3
Total Population Covered: 2647 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 02-Nov-2023 Actual Date of Completion (Capex): 01-Jul-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 30.04Mt / 114.15 Mtr Gopalpur 29.606222 78.111898
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 12.50 HP 600 LPM / 50 Mtr Gopalpur 29.606222 78.111898
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 200 KL /14.00 mtr Gopalpur 29.606248 78.112015
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K-7 DI Pipe 100 0.015
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6 Class 125 0.241
2 HDPE Pipe PN-6 Class 160 0.043
3 HDPE Pipe PN-6 Class 140 0.362
4 HDPE Pipe PN-6 Class 110 0.172
5 HDPE Pipe PN-6 Class 90 0.340
6 HDPE Pipe PN-6 Class 75 0.980
7 HDPE Pipe PN-6 Class 63 5.991
HSC Connection
Sno. Total Nos.
1 530
Other Details
1.97
1.97
1.97
29-Dec-2024
30-Dec-2024