| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20014054 | Name of Scheme: GARHI KALANJARI W/S SCHEME | No. of Villages: 1 | No. of Habitation Covered: 1 |
| Total Population Covered: 6200 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 31-Dec-2024 | Actual Date of Completion (Capex): 01-Mar-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 28.5/93 | GARHI KALANJARI | 28.790671 | 77.393442 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSIBLE PUMP | 850/69 | GARHI KALANJARI | 28.790671 | 77.393442 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 300/12 | GARHI KALANJARI | 28.790614 | 77.393448 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | K7 | 100 | 0.0048 | |
| 2 | K7 | 200 | 0.0089 | |
| 3 | K7 | 150 | 0.0354 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 90 | 0.2247 | |
| 2 | HDPE | 75 | 0.3711 | |
| 3 | HDPE | 63 | 10.074 | |
| 4 | HDPE | 200 | 0.2103 | |
| 5 | HDPE | 180 | 0.7892 | |
| 6 | HDPE | 160 | 0.114 | |
| 7 | HDPE | 140 | 0.0735 | |
| 8 | HDPE | 110 | 0.3103 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 725 |