Scheme ID: 20014068 Name of Scheme: Poornpur Nawada W/S Scheme No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 4014 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 14-Mar-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 18/ 102.5 Poornpur Nawada 28.8023 77.3812
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 550 LPM/ 70 m Poornpur Nawada 28.8023 77.3812
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 200/ 12 Poornpur Nawada 28.795000 77.385555
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K-7 100 0.0237
2 K-7 150 0.0109
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 90 0.417
2 HDPE 75 0.125
3 HDPE 63 3.783
4 HDPE 125 0.088
5 HDPE 180 0.154
HSC Connection
Sno. Total Nos.
1 450
Other Details
1.89
1.89
1.77
14-Mar-2024
15-Mar-2024