Project Completion Certificate (Ground Water)
Scheme ID: 20014092 Name of Scheme: UMARPUR WATER SUPPLY SCHEME No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 1941 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 29-Sep-2023 Actual Date of Completion (Capex): 11-Dec-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 38.25 MTR / 101.25 MTR UMARPUR 29.550033 78.243455
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSILEBE PUMP 10 HP 450 LPM / 41 MTR UMARPUR 29.550033 78.243455
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 150 KL / 12 MTR UMARPUR 29.550222 78.243347
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K-7 DI PIPE 100 0.025
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN-6 CLASS PE-100 160 0.220
2 HDPE PIPE PN-6 CLASS PE-100 140 0.703
3 HDPE PIPE PN-6 CLASS PE-100 110 1.317
4 HDPE PIPE PN-6 CLASS PE-100 90 0.098
5 HDPE PIPE PN-6 CLASS PE-100 75 0.135
6 HDPE PIPE PN-6 CLASS PE-100 63 2.099
HSC Connection
Sno. Total Nos.
1 347
Other Details
1.78
1.78
1.78
09-Jun-2024
10-Jun-2024