| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20014112 | Name of Scheme: PALPUR BARAGI KHERA | No. of Villages: 1 | No. of Habitation Covered: 6 |
| Total Population Covered: 2168 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 05-Mar-2023 | Actual Date of Completion (Capex): 06-Sep-2023 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 24.01 M/ 90.18 M | PALPUR BARAGI KHERA | 27.252606 | 80.358184 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible | 0.740 M³ per Min /45Mtr | PALPUR BARAGI KHERA | 27.252606 | 80.358184 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 225 KL/ 16 Mtr | PALPUR BARAGI KHERA | 27.25246 | 80.357891 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | D. I. Pipe | 150 | 0.01994 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE Pipe PN-6, Class PE-100 | 63 | 3.9738 | |
| 2 | HDPE Pipe PN-6, Class PE-100 | 75 | 4.2655 | |
| 3 | HDPE Pipe PN-6, Class PE-100 | 90 | 2.051 | |
| 4 | HDPE Pipe PN-6, Class PE-100 | 140 | 1.1397 | |
| 5 | HDPE Pipe PN-6, Class PE-100 | 160 | 0.9677 | |
| 6 | HDPE Pipe PN-6, Class PE-100 | 200 | 0.4054 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 476 |