Project Completion Certificate (Ground Water)
Scheme ID: 20014130 Name of Scheme: GADHAN KHURD WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 5
Total Population Covered: 2962 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-May-2023 Actual Date of Completion (Capex): 15-Jan-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 24/147.01 GADHAN KHURD 26.15855 83.08177
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 350/45 GADHAN KHURD 26.15855 83.08177
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 100/12 GADHAN KHURD 26.15855 83.08177
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K-7/DI PIPE 150 0.05
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 63 6.555
2 HDPE Pipe PN-6: Class PE-100 75 1.090
3 HDPE Pipe PN-6: Class PE-100 90 1.3
4 HDPE Pipe PN-6: Class PE-100 110 0.6
5 HDPE Pipe PN-6: Class PE-100 125 0.35
6 HDPE Pipe PN-6: Class PE-100 140 0.240
7 HDPE Pipe PN-6: Class PE-100 180 0.250
HSC Connection
Sno. Total Nos.
1 245
Other Details
1.86
1.86
1.86
17-Apr-2024
18-Apr-2024