Project Completion Certificate (Ground Water)
Scheme ID: 20014151 Name of Scheme: Nagla Sukul No. of Villages: 3 No. of Habitation Covered: 3
Total Population Covered: 2070 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 12-Sep-2022 Actual Date of Completion (Capex): 14-Aug-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 4321.20
2 HDPE 75 553
3 HDPE 90 973
HSC Connection
Sno. Total Nos.
Other Details
1.74
1.89
1.89
15-Jan-2024
14-Apr-2024