Project Completion Certificate (Ground Water)
Scheme ID: 20014153 Name of Scheme: Naseerpur Bhoja No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 2580 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 13-Sep-2021 Actual Date of Completion (Capex): 09-Apr-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 4192.20
2 HDPE 110 1840.30
HSC Connection
Sno. Total Nos.
Other Details
1.76
2.04
2.04
09-Apr-2024
10-Apr-2024