| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20014173 | Name of Scheme: TAHPUR GRAMIN PEYJAL YOJNA | No. of Villages: 1 | No. of Habitation Covered: 1 |
| Total Population Covered: 2614 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 06-Jan-2024 | Actual Date of Completion (Capex): 30-Dec-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | 150 MM SLOTTER PIPE | 18.01 | TAHPUR | 26.969804 | 79.680151 |
| 2 | 150 MM DIA PLAIN PIPE | 66.91 | TAHPUR | 26.969804 | 79.680151 |
| 3 | 200 MM DIA PLAIN PIPE | 60.47 | TAHPUR | 26.969804 | 79.680151 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSIBLE PUMP | 500 LPM | TAHPUR | 26.969804 | 79.680151 |
| 2 | SUBMERSIBLE PUMP | 61 Mtr. | TAHPUR | 26.969804 | 79.680151 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | RCC | 175/16 | TAHPUR | 26.969804 | 79.680151 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 100 | .050 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 4.398 | |
| 2 | HDPE | 75 | 1.702 | |
| 3 | HDPE | 90 | .058 | |
| 4 | HDPE | 140 | .107 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 479 |